Who this is for
Homeowners who want a kitchen that can cook, gather, and take Gulf light — and who are willing to decide finishes before the saws arrive.
Not a fit: Cabinet-only swaps with no scope, or a bid contest with no drawings.
The room does not belong to the house
A catalog kitchen dropped into a coastal house reads as a showroom. We write millwork, stone, and lighting as one language, then build it.
The number was never a scope
Two kitchens of the same size can be far apart depending on openings, appliances, and what is inside the walls. We price the work, not a square-foot slogan.
You still have to live here
Occupied-home kitchens need a temporary kitchen plan, protection, and a sequence that does not punish the rest of the house.
Questions we actually get
How do we start?
Request a Project Review. Tell us the property, the work, and the budget range you will actually spend. We will tell you whether we are a fit before anyone pretends there is a start date.
Are you licensed?
Yes. Beniamin Dumitrascuta holds Florida Certified General Contractor license CGC1531404, current and active. Verify it on the Florida DBPR site — do not take a logo as evidence.
How long does a kitchen take?
A straightforward kitchen is often a few months of construction after selections and lead times. Anyone promising a date before a scope is selling certainty they do not have.
Do you work with my designer?
Yes, when there is a real set of decisions. Roxana can also direct interiors and materials if you do not have one.
Next step
Request a private Project Review.
Tell us about the property and the work. We will tell you whether we are the right contractor — and what the first honest next step is.


